Future Development Nearby

FUTURE DEVELOPMENT NEARBY - ARTHA INDUSTRIAL HILL

Elevated Tol Cikampek

The elevated toll cikampek has been built above the existing Jakarta-Cikampek Toll Road for 36.4-kilometre-long. It will ease the traffic between Artha Industrial Hill and Jakarta and other surrounding cities.

FUTURE DEVELOPMENT NEARBY 2 - ARTHA INDUSTRIAL HILL

LRT (Light Rail Transit)

The Light Rail Transit (LRT) will link a great number of destinations and integrate with other type of transportation. The construction of the LRT has reached 77% and is expected to start operating by the end 2021, particularly for the Cawang-Cibubur and Cawang-Dukuh Atas routes. Meanwhile, the Cawang-East Bekasi route, currently progressing at 87%, will operating soon.

FUTURE DEVELOPMENT NEARBY 2 - ARTHA INDUSTRIAL HILL
FUTURE DEVELOPMENT NEARBY 3 - ARTHA INDUSTRIAL HILL

High Speed Train

High speed train will provide safe and efficient way of transport. It will provide a major boost to local business and the economy. High speed train will help to reduce the traveling time substantially from Jakarta & Bandung, and overcome the needs in reducing emission. There will be a terminal 5 minutes away from AIH. Until September 2020, the high speed train project has reached 60% and is targeted for completion in 2022.

FUTURE DEVELOPMENT NEARBY 4 - ARTHA INDUSTRIAL HILL

International Airport West Java

The new International airport in West Java has been built at Kertajati, it is about 110 km from Artha Industrial Hill, or about 68 km from Bandung, capital city of West Java Province. It can be accessed from AIH through Cipali Toll Road. Project implementation consists of five phases: preparation phase (2015), phase I (2015-2020), the project focused on airport development, phase I-II (2016-2025) will be Kertajati Aerocity development and purpose phase III and IV after 2025.

FUTURE DEVELOPMENT NEARBY 4 - ARTHA INDUSTRIAL HILL
FUTURE DEVELOPMENT NEARBY 5 - ARTHA INDUSTRIAL HILL

Patimban International Seaport

The port is located in Subang, about 75 kilometers from Karawang. It has a container capacity of 3.75 million TEUS and will be expanded to 5.5 million TEUS in Phase 2 and 7.5 million TEUS in Phase 3. Patimban International Seaport is in Phase 1-2 of its construction and has been partly operating since inaugurated by President Joko Widodo in December 2020. Patimban International Sea Port is projected to complete in 2027.